Galvanized steel, Galvanized sheet, Galvanized Steel Sheet quality zinc coating sheet galvanized steel coil
Product Description
Standard | AISI , ASTM , DIN , GB , JIS, BS |
Grade | SGCC DX51D SGCH SGCD DX52D DX54D |
Width | 100-1500mm |
Thickness | 0.13-3.5mm |
Zinc Coating | Z40-Z275, AZ30-AZ150 |
Coil ID | 508/610 mm |
Coil Weight | 3-8 MT/coil or as customer's requirements |
Surface Treatment | chromed / skin pass/ oiled /unoiled /slightly oiled/ dry |
Spangle | zero spangle / small spangle / regular spangle/ big spangle |
Package | export standard, plastic film+water proof paper + steel plate+ packing steel strip |
Application | Maily used in construction,automobile,metallurgy and electrical appliances etc. |
Price Items | FOB , CFR , CIF |
Payment Items | 30% deposit , the balance before the delivery |
Delivery Time | Will Produce for you after receiving your 30% advanced , and we will deliver it as your request . |
Remark | Insurance is all risks |
We accept the third party inspection
|
Application
Infrastructure: Building & Construction: Roofing; Terrace; Window frame; Door: Rolling-up Door; Shutter; Mobile House;Interior Decorations: Wall; Door frame; Steel Structure; Screen; Ceiling; Elevator;
Household Appliances :Fridge; Washing Machine; Microwave Oven; Air-Conditioner; Duplicating Machine, etc;
Transportation :Auto Panel; Interior Decorative Panel; Carriage Panel;
Company Information
Shandong SDG New maretials Corp (hereinafter referred to as SDG ), SDG is equipped with excellent equipment including two sets 1450 reversible rolling mills, three sets 1150 reversible rolling mills, two sets galvanizing & galvalume lines, two sets color coating lines, one set correcting machine, and one set pickling line.
FAQ
1. Are you trader or factory?
We are factory in Shandong, China.
2. How can we arrive your factory?
Please take flight to Jinan Airport or Jinan Station, it will take one and half hour to get our factory.
only one hour and fifty-eight minutes from Beijing/Peking to our Taian city by high speed railway.
3.How long is your delivery time?
For the first cooperation, common production time is 25 -30 days.
4. What's your payment terms?
We accept T/T, L/C at sight and Alibaba Trade Assurance.
If you have any other questions, please do not hesitate to contact us.
Contact us
Skype:
WhatsApp/Viber/Mobile: +86
WeChat:
QQ: 973015968
Email: Arthur @ sdgsteel.com